Built brand new industrial unit which was 28,000 sq ft and fit out of offices, kitchen and toilets. 2 acre of grounds works, Demolition Works &Landscaping
•Demolition of existing building
•Fabrication of steel for new industrial unit .
•Install of new roof and wall cladding
•Install of gutters , down pipes and flashings
•Block work partitions
•Built office area , kitchen and toilets
•Shaft wall system
•Full electrical rewire
•Full gas central heating
•New ventilation system
•Sectional roller doors
•Aluminium Glass shop fronts
•Decoration of full unit
•Install of full Drainge system including a surface water and foul water
•Install of foul and surface water pump stations
•Lay ducting for new supply of electricity , gas , BT Open reach
•Landscaping
•Install of fresh water supply laying barrier pipe.
•Building foundations for unit
•Formation of full car park including make up of ground and install of kerbs
•Resurfacing of 2 acre car park
•Install of palisade fencing